Projects
Madifushi Island Resort & Spa
Work in Progress
Design and Build turnkey MEP works, Power system, Desalination, Waste water treatment, Hot water system, HV/LV Distribution, HVAC etc
Waldorf Astoria Maldives (Ithaafushi Island)
Work in Progress
Design and Build turnkey MEP works, Power system, Desalination, Waste water treatment, Hot water system, HV/LV Distribution, HVAC etc.
Taj Exotica Resort
Supply of swimming pool filtration system and laundry equipment
Signature Residences, Rajagiriya (6 Sty Residential Development)
2015 - 2016
Design & Build Complete MEP works, Power System, Desalination, Waste Water Treatment, Hot Water System, HV/LV/ELV Distribution System, HVAC etc.
Nazeer’s Residence (12 Storey + Penthouse)
2015
Complete MEP works, Power system, Waste & Hot water system, HV/LV Distribution, HVAC etc.
Kurumathi Resort
2015
Design & Build MEP works, 2000kVA Genset, MSB Upgrade, 2X100kVA Remote Substations, 1X400 m3 per day Desalination Plant, 2X500 m3 Storage Tanks and Pool Filtration System
Kanufushi Resort
2015
Power Generation, Transformer & Switchgear. 2X300 m3 per day Desalination Plant and 500 m3 per day Sewage Treatment Plant
Anantara Kalutara Resort
2014 - 2016
Design & Build Complete MEP works, Power System, Desalination, Waste Water Treatment, Hot Water System, HV/LV/ELV Distribution, HVAC etc.
Peace Haven Resort
2014 - 2015
Supply of Fire Protection System
Baros
2014
Design & Build, Complete Power System Upgrade